{"id":5052,"date":"2015-04-23T09:38:11","date_gmt":"2015-04-23T09:38:11","guid":{"rendered":"http:\/\/188.164.206.52\/?p=5052"},"modified":"2015-04-23T09:38:11","modified_gmt":"2015-04-23T09:38:11","slug":"gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018","status":"publish","type":"post","link":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/","title":{"rendered":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d"},"content":{"rendered":"<div class=\"body divBody\">\n<p style=\"text-align: justify;\">A meeting of the representatives of the companies participating in ICGB AD, which has undertaken the construction and operation of the gas interconnector Greece \u2013 Bulgaria, was held yesterday in the presence of the Minister of Productive Reconstruction, Environment and Energy, Mr. Panayiotis Lafazanis, and the Minister of Energy of Bulgaria, Ms Temenuzhka Petkova.<\/p>\n<p style=\"text-align: justify;\">Shareholders of ICGB AD are: POSEIDON (in which DEPA and the Italian EDISON equally participate) and Bulgarian Energy Holding (BEH).<\/p>\n<p style=\"text-align: justify;\">The revised program of the project development was finalized in the meeting along with the road map for the starting of operation of the pipe line which is planned for 2018.<\/p>\n<p style=\"text-align: justify;\">The meeting, in continuation of the governments of Greece and Bulgaria, aimed at securing the conditions for the shortest project implementation.<\/p>\n<p style=\"text-align: justify;\">Furthermore, the two cooperating sides approved the budget for the funding of the necessary actions until the starting date of constructing the pipe line.<\/p>\n<p style=\"text-align: justify;\">The length of the interconnector will be 180km \u2013 30 of which on Greek territory (from Komotini to the Greek-Bulgarian borders) and 150km in Bulgaria.<\/p>\n<p style=\"text-align: justify;\">The transmission capacity will be 3 billion cubic meters of gas annually which can be increased to 5 billion cubic meters when a compressor is constructed.<\/p>\n<p style=\"text-align: justify;\">The meeting was signed by DEPA\u2019s CEO, Mr. Spyros Paleoyiannis, EDISON\u2019s representative, Mr. Elio Ruggeri, and the Co-CEO of BEH, Ms.Theodora Georgieva.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A meeting of the representatives of the companies participating in ICGB AD, which has undertaken the construction and operation of the gas interconnector Greece \u2013 Bulgaria,<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-5052","post","type-post","status-publish","format-standard","hentry","category-press-releases"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.\" \/>\n<meta property=\"og:description\" content=\"A meeting of the representatives of the companies participating in ICGB AD, which has undertaken the construction and operation of the gas interconnector Greece \u2013 Bulgaria, [\u2026]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/\" \/>\n<meta property=\"og:site_name\" content=\"DEPA COMMERCIAL S.M.S.A.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/depa.commercial\" \/>\n<meta property=\"article:published_time\" content=\"2015-04-23T09:38:11+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@depa_commercial\" \/>\n<meta name=\"twitter:site\" content=\"@depa_commercial\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/#\\\/schema\\\/person\\\/93883eb6ff799f4f204d20db4721ac3b\"},\"headline\":\"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d\",\"datePublished\":\"2015-04-23T09:38:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/\"},\"wordCount\":229,\"commentCount\":0,\"articleSection\":[\"Press Releases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/\",\"url\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/\",\"name\":\"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/#website\"},\"datePublished\":\"2015-04-23T09:38:11+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/#\\\/schema\\\/person\\\/93883eb6ff799f4f204d20db4721ac3b\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/\",\"name\":\"\u0394\u0395\u03a0\u0391 \u0395\u039c\u03a0\u039f\u03a1\u0399\u0391\u03a3 \u039c.\u0391.\u0395\",\"description\":\"| Official Website\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.depa.gr\\\/en\\\/#\\\/schema\\\/person\\\/93883eb6ff799f4f204d20db4721ac3b\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/","og_locale":"en_US","og_type":"article","og_title":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.","og_description":"A meeting of the representatives of the companies participating in ICGB AD, which has undertaken the construction and operation of the gas interconnector Greece \u2013 Bulgaria, [\u2026]","og_url":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/","og_site_name":"DEPA COMMERCIAL S.M.S.A.","article_publisher":"https:\/\/www.facebook.com\/depa.commercial","article_published_time":"2015-04-23T09:38:11+00:00","author":"admin","twitter_card":"summary_large_image","twitter_creator":"@depa_commercial","twitter_site":"@depa_commercial","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/#article","isPartOf":{"@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/"},"author":{"name":"admin","@id":"https:\/\/www.depa.gr\/en\/#\/schema\/person\/93883eb6ff799f4f204d20db4721ac3b"},"headline":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d","datePublished":"2015-04-23T09:38:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/"},"wordCount":229,"commentCount":0,"articleSection":["Press Releases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/","url":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/","name":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d - DEPA COMMERCIAL S.M.S.A.","isPartOf":{"@id":"https:\/\/www.depa.gr\/en\/#website"},"datePublished":"2015-04-23T09:38:11+00:00","author":{"@id":"https:\/\/www.depa.gr\/en\/#\/schema\/person\/93883eb6ff799f4f204d20db4721ac3b"},"breadcrumb":{"@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.depa.gr\/en\/gas-interconnector-greece-bulgaria-to-be-implemented-start-operating-in-2018\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.depa.gr\/en\/"},{"@type":"ListItem","position":2,"name":"\u201cGas Interconnector Greece-Bulgaria to be implemented \u2013 start operating in 2018\u201d"}]},{"@type":"WebSite","@id":"https:\/\/www.depa.gr\/en\/#website","url":"https:\/\/www.depa.gr\/en\/","name":"\u0394\u0395\u03a0\u0391 \u0395\u039c\u03a0\u039f\u03a1\u0399\u0391\u03a3 \u039c.\u0391.\u0395","description":"| Official Website","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.depa.gr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.depa.gr\/en\/#\/schema\/person\/93883eb6ff799f4f204d20db4721ac3b","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d72b33ee7f7f819d64990001557bec6435b2deca1af8a5c21de664dff9d31acb?s=96&d=mm&r=g","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/posts\/5052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/comments?post=5052"}],"version-history":[{"count":0,"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/posts\/5052\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/media?parent=5052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/categories?post=5052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.depa.gr\/en\/wp-json\/wp\/v2\/tags?post=5052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}